Plant Expansion / Construction
Kenmore Construction first started the rehabilitation and expansion of wastewater treatment plants in 1978.
Through the years, Kenmore has gained the expertise to take on some of the most challenging treatment plant
projects, a few of which are highlighted below. From complex design/build projects with ultraviolet disinfection
systems to pump station rehabilitation projects, Kenmore has the expertise to complete almost any treatment plant project.
| WWTP Expansion |
|
Owner |
City of Wadsworth |
| Location | Wadsworth, Ohio |
| Amount | $16,300,000 |
| Completion Date | March 2007 |
| Description |
The WWTP expansion included the installation of two 70' primary settling tanks, two 84' final
settling tanks, and four concrete aeration tanks. This project also calls for the rehabilitation
of the aeration system, the digester systemand the conveyor system. Finally, new sanitary and storm
sewer will be connected to existing sewers and new water and gas services will be included in the
rehabilitation of on-site buildings.
|
| WWTP Improvements |
|
Owner |
City of Twinsburg |
| Location | Twinsburg, Ohio |
| Amount | $3,100,000 |
| Completion Date | October 2002 |
| Description |
This project provided for the installation of a 90' diameter concrete digester tank and steel
floating covers as well as digester heating and bio gas systems. Also included in this project
is the installation of Two 42' diameter, glass lined, bolted steel trickling filter tanks with a
recirculation pumping station.
|
| Fishcreek WWTP Expansion |
|
Owner |
Summit County D.O.E.S. |
| Location | Stow, Ohio |
| Amount | $15,000,000 |
| Completion Date | July 2001 |
| Description |
The fishcreek WWTP Expansion project called for the installation of new plant headworks including
two mechanical bar screens and a grit removal system. The plant expansion also included a new
oxidation ditch and orbal equipment, a recirculation pumping station, two secondary clarifiers, and a new
tertiary filter. This project also called for the installation of an ultra violet disinfection system, a new aerobic system,
rehabilitation of the piping systems as well as building renovations.
|